Teledyne ACCQPrep HP125 Installation And Operation Manual page 27

Table of Contents

Advertisement

Figure 2-16 Z-Drive mounted on the Y-axis carriage
Figure 2-17 Z-Drive secured to the Y-axis carriage
3. Remove the two screws from the Y axis carriage. Slide the
Z-Drive onto the arm until the two holes align with the
matching holes in the Y-axis carriage.
4. Using the two plastic thumbscrews, secure the Z-Drive to
the carriage and finger tighten (Figure 2-17).
5. Rotate the Z-Drive rotor back and forth to ensure that the
Z-Drive moved up and down freely (Figure 2-18).
Note
If the rotor does not move freely, check that the other cables
are not interfering with the movement of the green probe cable.
ACCQPrep HP125
Section 2 Installation
2-11

Advertisement

Table of Contents
loading

Table of Contents