Teledyne ACCQPrep HP125 Installation And Operation Manual page 36

Table of Contents

Advertisement

ACCQPrep HP125
Section 2 Installation
Figure 2-32 Column Mounting Parts
Figure 2-33 Column track on the ACCQPrep
2-20
To install a column onto the ACCQPrep:
1. Select the proper sized column mount and simply slip the
mount into one of the two column mounting tracks on the
side of the ACCQPrep (Figure 2-33).
2. Remove the union connecting the column fluid supply line
to the column effluent line.
3. Connect the line from the injection valve to the inlet of the
column and connect the remaining tubing to the
column outlet (Figure 2-34).

Advertisement

Table of Contents
loading

Table of Contents