Teledyne ACCQPrep HP125 Installation And Operation Manual page 40

Table of Contents

Advertisement

ACCQPrep HP125
Section 2 Installation
Step
Section
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Certification of Section 2 Completion
Comments:
2-24
Table 2-1 Installation Qualification Checklist
Description
Unpacking the unit
Instrument location
Connect power
Install AutoSampler (if applicable)
Set up solvent lines
Set up waste lines
ELSD/PurIon connections and gas supply (if
applicable)
Connect and route drain lines
Position the system
Installation of the collection tube racks
External detector (optional)
Turn on the power
Configure the system
Prime the solvent lines
Prime AutoSampler wash station (if installed)
System verification
Installer Name (print):
Installer Signature:
Operator Name (print):
Operator Signature:
Installer
Initials
Date:
Date:
Operator
Initials

Advertisement

Table of Contents
loading

Table of Contents