Teledyne ACCQPrep HP125 Installation And Operation Manual page 33

Table of Contents

Advertisement

Figure 2-26 Probe tubing affixed to the side of the
ACCQPrep
Figure 2-27 Location of the test tube and the wash well on
the AutoSampler
To Power on the System
Figure 2-28 On switch for the AutoSampler
4. Install the included 18 mm test tube in the receptacle at
the right rear corner of the AutoSampler platform just to
the left of the wash well (Figure 2-27). Fluid in this tube
will be used for bracketed solvent injections. In this tech-
nique, the injected sample is separated from the chromato-
graphic solvents by a small amount of air and a "bracket"
solvent during the sample loading and injection process.
18 mm Test tube
The AutoSampler gets its power from the ACCQPrep.
1. Turn O
the power switch on the AutoSampler (Figure
N
2-28).
ACCQPrep HP125
Section 2 Installation
Probe tubing
Wash well
2-17

Advertisement

Table of Contents
loading

Table of Contents