Teledyne ACCQPrep HP125 Installation And Operation Manual page 120

Table of Contents

Advertisement

ACCQPrep HP125
Section 6 Maintenance
Figure 6-30 ELSD Detection Options screens
Figure 6-31 Line filled with 40 ml of acetone
6-20
5. Lift the p-trap drain tubing up to approximately case top
level. Using a wash bottle, syringe, or suitable measuring
device, slowly fill the drain line with up to 40 mL of ace-
tone. Lift the end of the tubing as needed to transfer most
of the liquid into the spray chamber. Make sure the fluid
level in the tubing doesn't exceed the level of the instru-
ment case top. If the tubing is raised too fast, fluid may
flow out the top of the vent tube causing a spill. Hold the
tubing up for at least 1 minute after the fluid has been
transferred to the spray chamber.

Advertisement

Table of Contents
loading

Table of Contents