Accqprep Equipped With Optional Elsd - Teledyne ACCQPrep HP125 Installation And Operation Manual

Table of Contents

Advertisement

ACCQPrep HP125
Section 2 Installation
2.2.4 ACCQPrep Equipped
with Optional ELSD
Figure 2-9 Location of ELSD gas port (Nitrogen input line
circled)
Figure 2-10 Back of ACCQprep with optional ELSD
2-6
Note
Teledyne ISCO recommends >99% pure nitrogen from a
source that can deliver 2.5 SLPM at 60 to 70 psi.
The ACCQPrep ELSD system has several additional connections.
1. Install the ELSD P-trap vent assembly found in the acces-
sory package (PN 3-250004) by placing the short tube into
the port on the rear panel, orienting the vent as shown and
tightening the fitting nut finger tight plus a small amount
more with a wrench (Figure
2-10).

Advertisement

Table of Contents
loading

Table of Contents