Wave IP 2500 Installation Guide
A Wave IP 2500 base unit with 1 EXU is shown below.
+PUVCNNKPI C /GFKC 4GUQWTEG /QFWNG
Only one MRM can be installed on the ISC1.
1.
2.
3.
4.
5.
6.
7.

Unplug the Wave IP 2500's power cord, but do not disconnect the grounding wire.
Remove the ISC1 from the Wave IP 2500 base unit. To do so:
Label or note the position of any cables connected to the ISC1 faceplate.
Disconnect all cables from the faceplate.
Loosen the retention screws.
Open the insertion lever at the left side of the faceplate, then pull firmly on the lever
to disengage the ISC1 from its slot.
Place the ISC1 on a static-safe work area.
Install the MRM standoffs on the ISC1 with the screws provided.
Align the MRM over the standoffs, and then fasten the retention screws in the corner
holes.
Plug the MRM ribbon connector into connector P4 (the light-blue 40-pin socket) on the
ISC1.
Re-install the ISC1 in the Wave IP 2500 base unit. To do so:
Slide the ISC1 back into its slot.
Engage the insertion lever.
Fasten the retention screws.
Reconnect cables to the faceplate.