Vertical WAVE IP 2500 Installation Manual page 30

Hide thumbs Also See for WAVE IP 2500:
Table of Contents

Advertisement

Wave IP 2500 Installation Guide
6Q YCNN OQWPV VJG 9CXG +2  EJCUUKU
1.
2.
3.
4.

Prepare a piece of plywood that meets the following minimum dimensions for proper
ventilation and service access:
Thickness—0.75 inches (2 cm)
Height—24 inches (61 cm)
Width— 34 inches (86.4 cm)
Draw a vertical line on the plywood 4 inches (10.2 cm) from the left edge, and a
horizontal line 3-1/4 inches (8.3 cm) from the top edge:
4"
(10.2 cm)
3 1/4"
(8.3 cm)
24"
(61 cm)
Locate supporting studs in your wall, and firmly attach the prepared piece of plywood to
the studs using the appropriate screws.
If the mounting brackets are currently installed on the front of the Wave IP 2500, remove
them.
For Review Only - Draft Document 09/07/07
COMPANY CONFIDENTIAL - DO NOT Distribute
34 "
(6.4 cm)
Two lines
Plywood

Advertisement

Table of Contents
loading

Table of Contents