Ghqtg ;Qw $Gikp; Site Preparation; Environmental Requirements; Safety Requirements - Vertical WAVE IP 2500 Installation Manual

Hide thumbs Also See for WAVE IP 2500:
Table of Contents

Advertisement

Chapter 2

$GHQTG ;QW $GIKP

It is important to set up your site properly before installing the Vertical Wave IP 2500. Follow
the guidelines in this chapter to ensure that all required services and tools are available. Review
the following sections before installing the Wave IP 2500:
5KVG 2TGRCTCVKQP
Before removing the Wave IP 2500 from the packing material do the following:
Caution:
power failure.

Site Preparation

Safety Requirements

Unpacking the Wave IP 2500

Determine the Wave IP 2500 chassis location. The Wave IP 2500 requires a dust-free
location with heating, air conditioning, and ventilation. See "Environmental
Requirements" on page 2-2.
Install all punchdown blocks and patch panels.
Purchase and install an EIA- or IEC-compliant, 19-inch equipment rack, if you plan to
rack mount the Wave IP 2500.
Install TIA/EIA-568A standard cabling (for example, Category 3 for voice, or Category 5
for voice and data).
Verify line connectivity.
An Uninterruptible Power Supply (UPS) is strongly recommended in case of a site
For Review Only - Draft Document 09/07/07
COMPANY CONFIDENTIAL - DO NOT Distribute


Advertisement

Table of Contents
loading

Table of Contents