Vertical WAVE IP 2500 Installation Manual page 24

Hide thumbs Also See for WAVE IP 2500:
Table of Contents

Advertisement

Wave IP 2500 Installation Guide
2TQRGT .KHVKPI
The Wave IP 2500 chassis weighs 26 pounds (11.8 kg) and each EXU weighs 19 pounds (8.6
kg).
Caution:
to yourself or damage to the system.
The following steps are guidelines for properly lifting heavy objects from the ground.
6Q OQXG VJG 9CXG +2 
1.
2.
3.
4.
5.
6.
7.
7PRCEMKPI VJG 9CXG +2 
When you receive the Wave IP 2500, locate the packing slip on the outside of the box. The
packing slip lists the various Wave IP 2500 components that you ordered.
Each Wave IP 2500 includes the following items:

Lift the Wave IP 2500 with assistance whenever possible to prevent possible injury
Position your feet at shoulder width.
Keep your back straight.
Bend at your hips and knees.
Grasp the Wave IP 2500 by opposite corners, and position your body so the weight is
centered over your feet.
Lift the chassis slowly with your leg muscles.
Avoid twisting motions.
Bend at your hips and knees to put the chassis down.
Wave IP 2500 base unit.
Additional modules and cards that you ordered.
Vertical Wave Documentation CD. Includes Vertical Wave manuals and Quick Reference
Guides in Acrobat format.
Vertical Wave System Recovery Disk. Provides a backup of your Vertical Wave system
as it was shipped. You only need to use the Recovery Disk in the unlikely event of a
system failure. For more information, see the Wave IP 2500 System Recovery Guide,
included on the Wave Documentation CD.
Power cord.
For Review Only - Draft Document 09/07/07
COMPANY CONFIDENTIAL - DO NOT Distribute

Advertisement

Table of Contents
loading

Table of Contents