Installing Multiple Extension Units In Layers - Mitsubishi Electric GT1695M-XTBD User Manual

Got1000 gt16 series graphic operation terminal
Hide thumbs Also See for GT1695M-XTBD:
Table of Contents

Advertisement

7.1.3

Installing multiple extension units in layers

This section describes how to install another extension units on the extension units that has been installed
on the GOT.
When no extension units is installed on the GOT, apply the steps in this section after installing an extension
units.
• Option unit (
• Communication unit (
1
Remove the connector cover and sticker from the installed extension units.
2
Install the unit on the unit that has been installed.
3
After installing the unit, fasten it by tightening the mounting screws (2 places) with tightening torque of
0.36 to 0.48N·m.
7
7.1 Communication Unit
- 13
7.1.3 Installing multiple extension units in layers
7.2.2 Installing procedure)
7.1.2 Installing procedure)
Connector cover
Sticker

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt1685m-stbaGt1685m-stbdGt1695m-xtba

Table of Contents