Mitsubishi Electric GT1695M-XTBD User Manual page 69

Got1000 gt16 series graphic operation terminal
Hide thumbs Also See for GT1695M-XTBD:
Table of Contents

Advertisement

6.
WIRING
Before starting wiring, always switch off the GOT power externally in all phases.
Not doing so may cause an electric shock, product damage or malfunction.
Please make sure to ground FG terminal, LG terminal, and protective ground terminal of the GOT
power supply section by applying Class D Grounding (Class 3 Grounding Method) or higher which is
used exclusively for the GOT.
Not doing so may cause an electric shock or malfunction.
Correctly wire the GOT power supply section after confirming the rated voltage and terminal
arrangement of the product.
Not doing so can cause a fire or failure.
Tighten the terminal screws of the GOT power supply section in the specified torque range.
Undertightening can cause a short circuit or malfunction.
Overtightening can cause a short circuit or malfunction due to the damage of the screws or the GOT.
Exercise care to avoid foreign matter such as chips and wire offcuts entering the GOT. Not doing so
can cause a fire, failure or malfunction.
This section describes wiring to the GOT power supply section.
For the connection to a controller, refer to the following manual.
GOT1000 Series Connection Manual
For external dimensions of connection cable, refer to the following.
Appendix.1 External Dimensions
DANGER
CAUTION
1
2
3
4
5
6
7
8
6
- 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt1685m-stbaGt1685m-stbdGt1695m-xtba

Table of Contents