Mitsubishi Electric GT1695M-XTBD User Manual page 89

Got1000 gt16 series graphic operation terminal
Hide thumbs Also See for GT1695M-XTBD:
Table of Contents

Advertisement

7
When installing an extension unit on the outer layer, refer to the following.
7.1.3 Installing multiple extension units in layers
When not installing an extension unit on the outer layer, cover the top of mounting screws (4
places) with accessory stickers in order to avoid receiving static electricity.
Keep the connector cover fixed.
Keep the sticker stuck as it is.
(3) GT15-75QBUSL, GT15-75QBUS2L, GT15-75ABUSL, GT15-75ABUS2L
1
Power OFF the GOT.
2
Remove the two extension unit covers of the GOT rear face.
3
Install the communication unit on the extension interface of the GOT rear face.
(When the extension unit is installed in GOT, remove the installed extension unit. And, do not
touch the board in the GOT when install the communication unit.)
7.1 Communication Unit
7.1.2 Installing procedure
1
2
3
4
5
6
7
8
7
- 6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt1685m-stbaGt1685m-stbdGt1695m-xtba

Table of Contents