1.Replacement and Adjustment
5.
Lift the fastener of the LCD I/F cable on the CPU board side.
6.
CPU board [A] (LCD I/F cable ×1)
After replacing the CPU board, make sure that the latest version of the firmware is installed on the Smart
Operation Panel. Update it if necessary.
Micro Computer Board
1.
Operation panel unit
2.
CPU board
(CPU
Board)
8
(Operation Panel
Unit)
(Updating the Smart Operation
Panel)
Need help?
Do you have a question about the M0A0 and is the answer not in the manual?
Questions and answers