Pis Oil Pump Bracket; Idler; Water Inlet Pipe And Bypass Pipe; Aic Compressor Bracket - Mazda MX-5 1990 Workshop Manual

Hide thumbs Also See for MX-5 1990:
Table of Contents

Advertisement

ENGINE STAND DISMOUNTING
B
05UOBX-254
05UOBX-255
05UOBX-256
05UOBX-257
PIS Oil Pump Bracket
1. Install the PIS oil pump bracket.
Tightening torque:
37-52
N·m
(3.8-5.3
m-kg,
27-38
ft-Ib)
Idler
1. Install the
Ale
idler.
Tightening torque:
37-52
N·m
(3.8-5.3
m-kg,
27-38
ft-Ib)
Water Inlet Pipe and Bypass Pipe
1. Remove all foreign material from the water inlet pipe mount-
ing surface.
2. Install a new gasket and the water inlet pipe.
Tightening torque!
19-25
N·m
(1.9-2.6
m-kg,
14-19
ft-Ib)
3. Apply a small amount of engine coolant to the new O-ring.
4. Install the water bypass pipe.
AIC Compressor Bracket
1. Install the
Ale
compressor bracket.
Tightening torque:
@:
19-25
N·m
(1.9-2.6
m-kg,
14-19
ft-Ib)
@! 37-52 N·m (3.8-5.3
m-kg,
27-38
ft-Ib)
Exhaust Manifold
1. Remove all foreign material from the exhaust manifold con-
tact su rface.
2. Install a new gasket and the exhaust manifold.
Tightening torque:
38-46
N·m
(3.9-4.7
m-kg,
28-34
ft-Ib)
Exhaust Manifold Insulator
1. Install the exhaust manifold insulator.
Tightening torque:
7.8-11
N·m
(80-110
em-kg,
69-95
in-Ib)
8-83

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents