Transmission; Starter; Installation - Mazda MX-5 1990 Workshop Manual

Hide thumbs Also See for MX-5 1990:
Table of Contents

Advertisement

B
INSTALLATION
INSTALLATION
PROCEDURE
1. Tighten all bolts and nuts to the specified torques.
Step 1
Torque Specifications
EXHAUST PIPE
BRACKET
\'
\
'
8-84
\
\
\
\.-
37-52 (3.8-5.3. 27-38)
05U08X-260
~
64-89 (6.5-9.1, 47-66)
N·m (m-kg, ft-Ib)
05UOBX-258
Transmission
1. Join the engine and transmission.
2. Install the transmission mounting bolts.
Caution
• Install the exhaust pipe bracket as shown.
3. Tighten the bolts.
Tightening torque:
64-89
N·m
(6.5-9.1
m-kg,
47-66
ft-Ib)
Starter
1. Install the starter to the transmission housing.
Tightening torque:
37-52
N·m
(3.8-5.3
m-kg,
27-38
ft-Ib)
2. Install the starter bracket bolt.
Tightening torque:
37-52
N·m
(3.8-5.3
m-kg,
27-38
ft-Ib)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents