Installing A 7X20 Cable Management Arm - Oracle ZS5 SERIES Installation Manual

Hide thumbs Also See for ZS5 SERIES:
Table of Contents

Advertisement

Installing a 7x20 Cable Management Arm

Installing a 7x20 Cable Management Arm
Use the following procedure to install the optional cable management arm (CMA) for a 7x20
controller.
This procedure is completed from the back of the equipment rack.
Unpack the CMA and identify its components.
Before You Begin
To prepare for installing the optional cable management arm (CMA), follow these guidelines:
Route cluster cables, long-term host cables (including InfiniBand, Fibre Channel, and
Ethernet Cables) and up to 12 disk shelf SAS cables through the CMA.
Do not route short SAS daisy chain cables through the CMA. Do not route an excess of
cables such that the CMA clamps bow or appear structurally unfit to support the weight.
164
Oracle ZFS Storage Appliance Installation Guide • December 2016

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZS5 SERIES and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Zs4-4De*-24Zs3 series

Table of Contents