8 Electrical Installation

8.6 Control Cables and Terminals

8.6.1 Access to Control Terminals
All terminals to the control cables are located underneath the terminal cover on the front of the frequency converter. Remove the terminal cover by means
of a screwdriver (see illustration).
8
Illustration 8.33: Frame sizes A1, A2, A3,B3, B4, C3 and C4

8.6.2 Control Cable Routing

Tie down all control wires to the designated control cable routing as shown in the picture. Remember to connect the shields in a proper way to ensure
optimum electrical immunity.
Fieldbus connection
Connections are made to the relevant options on the control card. For details see the relevant fieldbus instruction. The cable must be placed to the left
inside the frequency converter and tied down together with other control wires (see picture).
Control card wiring path for the D3. Control card wiring for the D1, D2,
D4, E1 and E2 use the same path.
178
Illustration 8.34: Frame sizes A5, B1, B2, C1 and C2
Control card wiring path for the F1/F3. Control card wiring for the F2/F4
use the same path.
MG.33.BC.02 - VLT
®
is a registered Danfoss trademark
FC 300 Design Guide