ABB IRB 1400 Product Manual page 111

Articulated robot
Hide thumbs Also See for IRB 1400:
Table of Contents

Advertisement

Step
Measuring units
Step
Installation of
sensor
Step
Result
The Levelmeter 2000 is now initialized and ready for service.
3HAC021111-001 Revision: B
Action
4.
If type 5 does not flash, press ZERO/SELECT to
select filter type 5 and press ENTER .
Action
1.
Press ON/MODE until the dot flashes under UNIT . Shown in the figure Level-
2.
Press ENTER.
3.
Press ZERO/SELECT until mm/m flashes.
Two decimals (0.00) are shown on the display
4.
Press ENTER.
Action
1.
Connect the sensor to the Sensor connection point. Shown in the figure Level-
2.
Press ON/MODE .
3.
Press ON/MODE until the dot flashes under SEN-
SOR .
4.
Press ENTER.
5.
Press ZERO/SELECT until a flashing "A" is shown.
6.
Press ENTER.
Wait until the "A" flashes again.
7.
Press ENTER.
5 Calibration, M2000
5.2.5 Initialization of Levelmeter 2000
Info/Illustration
Info/Illustration
meter 2000 on page 108!
Info/Illustration
meter 2000 on page 108!
109

Advertisement

Table of Contents
loading

Table of Contents