Install the Battery
See
"Install a PCIe Riser Into PCIe Slot 1 or 2" on page 101
Return the server to operation.
4.
a.
Install the server top cover.
See
b.
Close the fan door.
Return the server to the normal rack position.
c.
See
d.
Reconnect the power cords to the server power supplies and reconnect the
data cables.
See
e.
Power on the server.
See
Verify that the Power/OK status indicator is steady on.
Note -
the Network Time Protocol (NTP), the Oracle ILOM clock will be reset as soon as the server is
powered on and connected to the network; otherwise, proceed to the next step.
5.
If the service processor is not configured to use NTP, do one of the following:
Reset the Oracle ILOM clock using the Oracle ILOM CLI or the web interface.
■
For instructions, refer to the Oracle Integrated Lights Out Manager (ILOM) 3.2
Documentation Library at http://www.oracle.com/goto/ilom/docs.
Use the BIOS Setup Utility to reprogram the host clock.
■
For the BIOS Main menu screen that supports this procedure, refer to the Oracle X6 Series
Servers Administration Guide at http://www.oracle.com/goto/x86admindiag/docs.
118
Oracle Server X6-2 Service Manual • June 2016
"Install the Server Top Cover" on page
"Return the Server to the Normal Rack Position" on page
"Reconnect Data Cables and Power Cords" on page
"Power On the Server" on page
If the service processor is configured to synchronize with a network time server using
188.
193.
194.
191.
Need help?
Do you have a question about the X6-2 and is the answer not in the manual?