Fujitsu PRIMERGY BX600 User Manual page 91

Hide thumbs Also See for PRIMERGY BX600:
Table of Contents

Advertisement

Removal and Installation Routines
Installing a PCI expansion module
Electrostatically discharge yourself by touching a grounded object before
!
handling the components. Be aware that electrostatic-sensitive devices
(ESDs) should only be held at the edges and placed on a pad which is
free of electrostatic charge.
Any devices or tools that are used must be free of electrostatic charge.
For this purpose wear an electrostatic wristband or use a suitable
grounding cable that connects you to the external chassis of the system
unit.
Server blades with PCI modules must be installed in slots 5 and 6 of the
!
BX600 blade server system only. This is why the bend radius of front PCI
cables requires about 100 mm of space (see
To install a PCI module perform the following steps:
Ê Remove the SCSI hard disk drive module on the left side of the server
blade (see
page
U41057-J21-Z146-1-76
02-BX600-77).
March 2006
The Server Blade
page
02-BX600-97).
02
BX600
91

Advertisement

Table of Contents
loading

Table of Contents