Initial Operation And Operating; Controls And Indicators On The Server Front; Controls And Indicators On The Front Bezel - Fujitsu PRIMERGY BX600 User Manual

Hide thumbs Also See for PRIMERGY BX600:
Table of Contents

Advertisement

Installation and initial operation

Initial operation and operating

Controls and indicators on the server front

Controls and indicators on the front bezel

1
Power indicator (bicolor LED)
Lights amber:
Lights green:
2
System power ON/OFF button
When the system is switched OFF, pressing the power button for 2 seconds will
switch it ON.
When the system is operating and the button is kept pressed for 4 seconds, the
system will be gracefully shut down.
When the system is switched ON, pressing the power button for 10 seconds will
switch it OFF.
U41057-J21-Z146-1-76
1
System is ready for powering ON (5 V standby power
present).
System is switched ON.
March 2006
Initial operation and operating
2
3
4
02
BX600
29

Advertisement

Table of Contents
loading

Table of Contents