Installation and initial operation
Settings
Fibre Channel pass-thru Blade Port Assignment
There are two slots for FC pass-thru blades on the rear of the BX600 system.
The FC pass-thru blade in slot 1 provides a connection to channel A of the
installed FC daughter boards, while the FC pass-thru blade in slot 2 provides a
connection to channel B of the installed FC daughter boards.
2
1
The figure below shows the assignment of the server blade Fibre Channel ports
to the FC pass-thru blade ports.
FC pass-thru blade1
FC pass-thru blade 2
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A B A B A B A B A B A B A B A B A B A B