1.11.2 INSTALLATION PROCEDURE
Unplug the main machine power cord before starting the following
procedure.
If this finisher will be installed on the B230 or B237 copier, the following options must be
installed before installing this finisher.
- Bridge Unit (B227)
- Paper Feed Unit (B800) or LCT (B801)
1.
Unpack the finisher, and then remove the stopper [A] and tapes (
2.
Install the front joint bracket [B], holder bracket [C] (
joint bracket [D] (
The holder bracket [C] must be placed outside the front joint bracket [B]. The
holder bracket is provided with the bridge unit (B227).
B230/B237
x 2 - M4 x 14).
1-42
x 1).
x 2 - M4 x 14), and rear
SM