2.
Attach the paper guide [A].
3.
Attach the unit holder [B] and the holder bracket [C] (knob screw x 4).
The holder bracket [C] must be placed outside the unit holder [B]. The holder
bracket is provided with the bridge unit (B227).
4.
Install the 500-sheet finisher [D] on the machine (
5.
Attach the bracket cover [E].
6.
Install the output tray [F] on the 500-sheet finisher (2 snap rings).
7.
Pull out the tray extension [G] of the bridge unit.
8.
Turn on the main power switch, and then check the finisher operation.
B230/B237
x 1).
1-40
SM