1.10.2 INSTALLATION PROCEDURE
Unplug the main machine power cord before starting the following
procedure.
Before you install the 500-sheet finisher, the optional bridge unit (B227) must be
installed
Beforehand: Installing on a machine with the optional paper feed unit
or LCT
When you install this unit on a machine with the optional paper feed unit or LCT, you must
install support brackets on the optional paper feed unit or LCT. These support brackets can
prevent the machine from falling to the left side. You do not need to install support brackets
on machines without the optional paper feed unit or LCT.
B230/B237
1-38
SM