Epson EPL-N3000 Service Manual page 240

A4 monochrome laser printer
Hide thumbs Also See for EPL-N3000:
Table of Contents

Advertisement

EPSON EPL-N3000/AcuLaser M4000N
Installation
1.
Secure the ROS ASSY to the frame with the four screws (black, with collars,
8mm).
Never give impact to the ROS ASSY with a screwdriver or the like.
C A U T I O N
2.
Connect the connector of the HARNESS ASSY ROS to the board on the ROS
ASSY.
As the board of the ROS ASSY is easily damaged, connect the
C A U T I O N
connectors while supporting the board by hand.
3.
Clamp the harness with the two cable clamps on the ROS ASSY.
4.
Secure the PLATE TIE FRONT to the frame tightly with the eight screws (silver,
6mm).
Always do installation work on a horizontal and level table.
C A U T I O N
5.
Secure the harness to the PLATE TIE FRONT with the two clamps.
6.
Secure the DUCT HIGH with the three screws (silver, with collars, 8mm).
7.
Install the DUCT FRONT, FAN SUB. (p.241)
8.
Install the COVER FRONT. (p.172)
9.
Install the COVER TOP, CONTROL PANEL. (p.170)
10. Install the 500 EXIT ASSY. (p.262)
11. Install the COVER EXIT 500. (p.261)
12. Install the COVER RIGHT. (p.168)
13. Install the COVER LEFT. (p.169)
Disassembly and Assembly
14. Install the COVER REAR. (p.167)
Pay attention to the difference between the two types of screws and
C A U T I O N
use them at their correct positions respectively.
15. Install the COVER REAR 500. (p.270)
Xero
Revision C
240
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aculaser m4000n

Table of Contents