Epson EPL-N3000 Service Manual page 225

A4 monochrome laser printer
Hide thumbs Also See for EPL-N3000:
Table of Contents

Advertisement

EPSON EPL-N3000/AcuLaser M4000N
Installation
1.
Install the 550 FEEDER ASSY to the frame.
2.
Secure the CHUTE OUT to the frame with the two screws (silver, with collars,
with spring washers, 8mm).
One of the screws securing the CHUTE OUT to the frame should
C A U T I O N
also tighten the SPRING EARTH.
3.
Secure the PLATE TIE to the frame with the four screws (silver, with collars, with
spring washers, 8mm).
4.
Clamp the harness with the two clamps of the PLATE TIE. (See the figure)
When installing, pass the harness through the notch of the PLATE
C A U T I O N
TIE and route it as indicated by the arrow.
5.
Connect the connector (P/J248) of the HARNESS ASSY TRAY 2 to the
HARNESS ASSY CHUTE.
6.
Install the 150 FEEDER ASSY. (p.211)
7.
Install the CHUTE TRANSFR. (p.255)
In the hole on the left side of the CHUTE TRANSFER, a screw need
C A U T I O N
not be tightened.
8.
Install the FAN MAIN. (p.293)
9.
Install the COVER REAR. (p.167)
Pay attention to the difference between the two types of screws and
C A U T I O N
use them at their correct positions respectively.
Disassembly and Assembly
10. Install the FUSER ASSY. (p.253)
11. Install the COVER REAR 500. (p.270)
HARNESS ASSY TRA
HARNESS ASSY TRAY2
CLAMP
8)
Figure 4- 49. 550 FEEDER ASSY Installation
550 Paper Feeder
HARNESS ASSY
HARNESS ASSY CHUTE
7)
CLAMP
8)
NOTCH
Revision C
JG3114AA
225
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aculaser m4000n

Table of Contents