Avaya PARTNER Advanced Communications System Installation And Use Manual page 49

Advanced communications system
Hide thumbs Also See for PARTNER Advanced Communications System:
Table of Contents

Advertisement

7. Connect modular telephone cords to the
extension jacks, starting at the top extension
jack on the processor module
(see
Figure
2-20). When that module is full,
move to the leftmost module. Fill each module
before moving on to the next module to the
right.
8. Route each cord through the wire manager on
the front of the module (see
9. Connect the free end of each modular
telephone cord to the modular wall jacks for
system extensions.
10. Gather the line and extension cords hanging
below the wire managers of the first two
modules, and twist-tie or wire-wrap them.
Repeat for the remaining cords. For the 5-slot
carrier, place each bundle of wires in the
indentations cut out of the bottom edge of the
carrier.
Figure
2-20).
Figure 2-20. Connecting Cords to
Extension Jacks
Connecting Lines and Extensions
Installation
2-17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Partner acs

Table of Contents