Chassis-Mounted Rails; Figure 25 10-32 Threaded Hole Rack Installation - Freecom SUPERLOADER3 LTO2-HH Manual

Hide thumbs Also See for SUPERLOADER3 LTO2-HH:
Table of Contents

Advertisement

Figure 25 10-32
Threaded Hole Rack
Installation
Chassis-Mounted
Rails
7
2 Mount the front cover plate to the vertical rail in the identified holes
by using 10-32 x .625 bolts in the center two holes of the plate.
3 Mount the tab of the autoloader to the upper and lower holes in the
front cover plate using 10-32 x .625 bolts.
The following illustrations show various views of the chassis-mounted
rail system.
SuperLoader 3 Autoloader User's Guide
Chapter 7 Customer Replaceable Units (CRUs)
Installing and Removing the Optional V-Rail Kit
101

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quantum superloader 3

Table of Contents