Installation In A .280 Diameter Thru Hole Rack; Figure 23 .375 Square Hole Rack Installation - Freecom SUPERLOADER3 LTO2-HH Manual

Hide thumbs Also See for SUPERLOADER3 LTO2-HH:
Table of Contents

Advertisement

Figure 23 .375
Square Hole Rack
Installation
Installation in a
.280 Diameter Thru
Hole Rack
7
2 Mount the front cover plate to the vertical rail in the identified holes
by using 10-32 x .625 bolts in the center two holes of the plate.
3 Mount the tab of the autoloader to the upper and lower holes in the
front cover plate using 10-32 x .625 bolts.
To install the rail in a .280 diameter thru hole rack:
1 Identify the correct mounting holes on the vertical rail, making sure
that the selected holes are on the same level.
SuperLoader 3 Autoloader User's Guide
Chapter 7 Customer Replaceable Units (CRUs)
Installing and Removing the Optional V-Rail Kit
99

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quantum superloader 3

Table of Contents