Installation In A 10-32 Threaded Hole Rack; Figure 24 .280 Diameter Thru Hole Rack Installation - Freecom SUPERLOADER3 LTO2-HH Manual

Hide thumbs Also See for SUPERLOADER3 LTO2-HH:
Table of Contents

Advertisement

Chapter 7 Customer Replaceable Units (CRUs)
Installing and Removing the Optional V-Rail Kit
Figure 24 .280
Diameter Thru Hole
Rack Installation
Installation in a
10-32 Threaded
Hole Rack
7
100
2 Mount the front cover plate to the vertical rail in the identified holes
by using M6 (.200") threaded bolts in the center two holes of the
plate.
Note:
The upper and lower tabs of the inside plate will not enter
the holes of the rack. They will deform when secured.
3 Mount the side tab of the autoloader to the upper and lower holes in
the front cover plate using M6 (.200") threaded bolts.
To install the rail in a 10-32 threaded hole rack:
1 Identify the correct mounting holes on the vertical rail, making sure
that the selected holes are on the same level.
SuperLoader 3 Autoloader User's Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quantum superloader 3

Table of Contents