Mounting The Rail Kit; Connecting The Scsi And Power Cables - Freecom SUPERLOADER3 LTO2-HH Manual

Hide thumbs Also See for SUPERLOADER3 LTO2-HH:
Table of Contents

Advertisement

Chapter 2 Installation and Configuration

Mounting the Rail Kit

Mounting the Rail Kit

Connecting the SCSI and Power Cables

16
For instruction on mounting the autoloader in a standard 19-inch rack,
see
Installing and Removing the Optional V-Rail Kit
To connect the SCSI and power cables to the autoloader, follow these
steps:
1 Shut down and turn off the selected server. Turn off all attached
accessory devices, such as printers and other SCSI devices.
2 Attach one end of the SCSI cable (included in the accessory kit) to one
of the connectors on the back panel of the autoloader.
3 Attach the other end of the SCSI cable to the connector on the SCSI
host adapter or to the connector on the previous device on the SCSI
bus.
SuperLoader 3 Autoloader User's Guide
2
on page 95.
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quantum superloader 3

Table of Contents