Performance Verification; Introduction; Equipment Needed; Performance Tests - Nellcor OxiMax N-595 Service Manual

Hide thumbs Also See for OxiMax N-595:
Table of Contents

Advertisement

P e r f o r m a n c e Ve r i f i c a t i o n

Introduction

Equipment Needed

Performance Tests

N-595
This section discusses the tests used to verify performance following repairs or
during routine maintenance. All tests can be performed without removing the
N-595 cover. All tests except the battery charge and battery performance tests
must be performed as the last operation before the monitor is returned to the user.
If the N-595 fails to perform as specified in any test, repairs must be made to
correct the problem before the monitor is returned to the user.
Equipment
Digital Multimeter (DMM)
®
Durasensor
O
-M
XI
AX
sensor
O
M
oxygen sensor
XI
AX
Safety Analyzer
Pulse oximetry cable
Data interface cable
Stopwatch
Nellcor model SRC-MAX Tester
The battery charge procedure should be performed before monitor repairs
whenever possible.
Note:
This section is written using Nellcor factory-set defaults. If your
institution has pre configured custom defaults, those values will be
displayed. Factory defaults can be restored (see Reset Softkey on
page 40).

Table 1: Equipment Needed

Description
Fluke Model 87 or equivalent
DS-100A
oxygen
MAX-A
Must meet current AAMI ESI/1993 & IEC
60601-1/1998 specifications
DOC-10
EIA-232 cable (optional)
Manual or electronic
Provides testing for DigiCal compatible
Monitors
11

Advertisement

Table of Contents
loading

Table of Contents