Nellcor OxiMax N-595 Service Manual page 31

Hide thumbs Also See for OxiMax N-595:
Table of Contents

Advertisement

SETUP
NEXT
NEXT
NEXT
ANALOG
0 VOLT
Operation on Battery Power
N-595
Note:
If step 8 takes more than 2 minutes to complete, the analog output will
time out. Repeat steps 2 through 6 to initiate the analog output.
10. Move the positive lead back to pin 6.
11. Press the SETUP softkey.
12. Press the NEXT softkey.
13. Press the NEXT softkey.
14. Press the NEXT softkey.
15. Press the ANALOG softkey.
16. Press the 0 VOLT softkey.
17. Verify that the monitor's output voltage is +0.0 ± 0.025 VDC.
18. Leave the negative lead connected to pin 10 and verify 0.0 ± 0.025 VDC on
pins 13 and 14.
Note:
If step 16 takes more than 2 minutes to complete, the analog output will
time out. Repeat steps 10 through 14 to initiate the analog output.
19. Disconnect the voltmeter from the instrument.
1. Disconnect the instrument from AC power and verify that the AC POWER
indicator turns off.
2. Verify that the monitor continues monitoring normally and that the LOW
BATTERY indicator is not lit.
Performance Verification
23

Advertisement

Table of Contents
loading

Table of Contents