Section 3: Performance Verification; Introduction; Equipment Needed; Performance Tests - Nellcor NPB-190 Service Manual

Pulse oximeter
Table of Contents

Advertisement

SECTION 3: PERFORMANCE VERIFICATION

3.1

INTRODUCTION

3.2

EQUIPMENT NEEDED

3.3

PERFORMANCE TESTS

3.3.1 Battery Charge
3.1 Introduction
3.2 Equipment Needed
3.3 Performance Tests
3.4 Safety Tests
This section discusses the tests used to verify performance following repairs or
during routine maintenance. All tests can be performed without removing the
NPB-190 cover. All tests except the battery charge and battery performance tests
must be performed as the last operation before the monitor is returned to the
user.
If the NPB-190 fails to perform as specified in any test, repairs must be made to
correct the problem before the monitor is returned to the user.
Equipment
Digital multimeter (DMM)
Durasensor oxygen transducer
Oxisensor II oxygen transducer
Pulse oximeter tester
Safety analyzer
Sensor extension cable
Serial interface cable
Stopwatch
The battery charge procedure should be performed before monitor repairs
whenever possible. It should also be performed before and after performing the
battery performance test (paragraph 3.3.2).
Note: This section is written using Mallinckrodt factory-set defaults. If your
institution has preconfigured custom defaults, those values will be
displayed. Factory defaults can be reset using the configuration
procedure described in paragraph 4.3.3.
Perform the following procedure to fully charge the battery.
1.
Connect the monitor to an AC power source.
Description
Fluke Model 87 or equivalent
DS-100A
D-25
SRC-2
Must meet current AAMI specifications
EC-4 or EC-8
EIA-232 cable (optional)
Manual or electronic
3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents