Reinstalling The Sensors; Completing The Inspection Procedure - Siemens Rapidlab 1200 Operator's Manual

Table of Contents

Advertisement

6-30
b. Push the clot-removal line through the fluid connector on the reagent manifold
1
Figure 6-14

Reinstalling the Sensors

1. Dry each sensor, ensure that the O-rings are in place, and then reinstall each sensor.
2. Connect the pinch valve tubing to the latch and the reagent manifold.
3. Press the tab on the spring-loaded latch to release the latch.
4. Close the measurement module door.

Completing the Inspection Procedure

1. Reinstall the cartridges and close the reagent and wash doors.
2. Perform the RCx reagent flow test:
a. Select
b. Select
c. Look at the sample path for obstructions and flow problems.
3. Select
4. Select
5. Select
6. Verify sensor performance by analyzing a minimum of 2 levels of quality control
material.
02087462 Rev. V
until the clot-removal line appears again.
Fluid connector
Rapidlab 1200 Systems Sample Path
.
Return
Fluidic Functions > RCx
.
Wash Cycle
.
Return
.
Analyze > Yes
Rapidlab 1200 Operator's Guide: Troubleshooting
.

Advertisement

Table of Contents
loading

Table of Contents