Performing acceptance tests
Contents
Acceptance tests
This chapter contains information about the following topics:
Acceptance tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Testing the sysload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Testing the PFTU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CAUTION
Ensure that the current Dependency Lists are installed.
Perform the following acceptance tests after the system loading is completed.
1
"Testing the module power supply" on
2
"Testing the blower unit and thermal sensor" on
3
"Testing the sysload" on
4
"Testing the system terminal and system monitor" on
5
"Testing the PFTU" on
page 320
page 323
page 325