This connection is NOT made for Network Group 0 in the Core/Net modules.
Procedure 68
Connecting Groups 1 through 7: Shelf 0 to Shelf 1
1
Connect an NT8D99AB cable from the A connector in Shelf 0 of Network
Group 1 to the A connector in Shelf 1 Network Group 1.
2
Connect the B connector in Shelf 0 to the B connector in Shelf 1.
3
Connect the C connector in Shelf 0 to the C connector in Shelf 1.
4
Connect the D connector in Shelf 0 to the D connector in Shelf 1.
5
Connect the E connector in Shelf 0 to the E connector in Shelf 1.
6
Connect the A, B, C, D, and E connectors between Shelf 0 and Shelf 1 for
all other Network groups in the system (except Group 0)
Note: All connections are made with an NT8D99AB cable.
Cabling network modules and loops