Table 2
List of tasks in subsections
Task
Preparing for installation
Placing the fourth module on a column
Positioning and leveling equipment
Installing overhead cable tray kits
Installing AC power
Installing DC power
Planning and designating a Main Distribution Frame
Installing Power Failure Transfer Units
Configuring the system monitor
Connecting a system terminal or modem
Cabling Common Equipment in a Single
Group system
Cabling Common Equipment in a Multi Group system
Cabling network modules and loops
Cabling lines and trunks
Powering up the system and initial loading
Performing acceptance tests
Installing earthquake bracing
Adding a module to a column
Introduction
Large System Installation and Commissioning
Page 39 of 436
Go to page
41
69
75
81
85
97
137
149
155
175
191
211
367
245
283
319
327
347

Advertisement

Table of Contents
loading

Table of Contents