Figure 129
3PE faceplate connection between the Core/Net modules
Net
PS
0
1
2
3
4
5
Connecting the Core/Net backplanes
Core
cCNI
A
B
Enb
Dis
6
7
8
9
10 11
c9 c10 c11 c12 c13 c14 c15 CP
In Group 0 only, the Shelf 0 and Shelf 1 backplanes must be connected with
two NT8D99AD cables (Core/Net modules only).
Procedure 67
Connecting the Core/Net backplanes
1
Connect one NT8D99AD cable from the "E" port in Core/Net 0 to the "E"
port in Core/Net 1.
2
Connect a second NT8D99AD cable from the "D" port in Core/Net 0 to the
"D" port in Core/Net 1. See Figure 130 on
Cabling network modules and loops
NT8D80AZ cable
Net
SYS
CP
UTIL
PIV
C
Enb
Dis
C
LAN 1
LAN 2
USB
L
L
COM 1
COM 2
U
INIT
RESET
PS
0
1
2
NT8D80AZ cable
End of Procedure
Large System Installation and Commissioning
Page 369 of 436
Core
cCNI
A
B
Enb
Dis
3
4
5
6
7
8
9
10 11
c9 c10 c11 c12 c13 c14 c15 CP
page
370.
SYS
CP
UTIL
PIV
C
Enb
Dis
C
LAN 1
LAN 2
USB
L
L
COM 1
COM 2
U
INIT
RESET
553-9123_3pe_r26revised