Avaya 1000M Installation And Commissioning Manual page 434

Communication server
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

Page 434 of 436
positioning
earthquake bracing, 341
equipment, 75
positioning guides
fourth modules, 70
module additions, 356, 362
power cables
fourth modules, 72
module additions, 352, 353, 355, 363, 364
power cords, 90
power systems, 63, 97
power-up
preparations, 283
PWR messages in acceptance tests
module power supply, 320
R
ramps, 62
receptacles, 85
ringing generators
acceptance tests, 320
rod installation
earthquake bracing, 335, 339
RS-232 cable
modem cabling, 185, 187
S
safety ground/protective earth
AC power, 86, 90
DC power, 113, 127
SDI (serial data interface) ports
modem connections, 183, 185, 187, 189, 190
system monitor interface, 157, 162
system terminal connections, 175
seismic anchor kits, 329, 330
seismic bracing kits, 329
Signaling Server, 49
NN43021-310
Standard 06.01
Index
March 2013
single-column systems
bracing rod installation, 339
ground and logic return distribution, 87, 91,
127
system monitor option switches, 157
single-row systems
superloop cabling, 380, 383
slave switch settings
system monitor, 158
spacers and spacer kits, 44
bracing rod installation, 340, 341
multiple-column systems, 76
SPG (single-point ground), 86
split mode monitoring, 176, 177
static discharge, 63
superloop adapter plates, 384
superloop cabling, 380
switch boxes
modem connections, 187, 189, 190
system terminal connections, 179, 181
sysloads
acceptance tests, 323
System 600/48 Power Plant
PDU connections, 129
system installation procedures, 37
system monitors
acceptance tests, 324
cabling, 161
configuring, 155
for DC power, 125
fourth modules, 72
module additions, 349, 352, 353, 354, 355,
358, 363, 364
system monitors, cabling, 155, 161
system terminals, 175
acceptance tests, 324
connections, 176
CPIO port connections, 178, 179, 181

Advertisement

Table of Contents
loading

Table of Contents