Cabling Common Equipment in a Multi Group system
(Figure 95 on
page
229). Four steps are required to configure the Fiber
Network:
"Installing the Shelf 0 fiber optic ring (ascending)" on
"Installing the Shelf 1 fiber optic ring (descending)" on
"FIJI to FIJI cabling" on
"Connecting the Clock Controller cables" on
Figure 95
Dual Ring Fiber Network
Group 1, shelf 1
Tx (J1)
Rx (J2)
J3
J4
Group 1, shelf 0
Tx (J1)
Rx (J2)
J3
J4
Group 0, shelf 1
Tx (J1)
Rx (J2)
J3
J4
NTRC48xx fiber optic cables
page
239.
Group 2, shelf 1
Tx (J1)
Rx (J2)
J3
J4
Group 2, shelf 0
Tx (J1)
Rx (J2)
J3
J4
Group 0, shelf 0
Tx (J1)
Rx (J2)
J3
J4
Large System Installation and Commissioning
Page 229 of 436
page
236.
page
237.
page
240.
Group 3, shelf 1
Tx (J1)
Rx (J2)
J3
J4
Group 3, shelf 0
Tx (J1)
Rx (J2)
J3
J4