Avaya 1000M Installation And Commissioning Manual page 317

Communication server
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

Powering up the system and initial loading
Procedure 51
Testing Core/Net 0
From Core/Net 0, perform these tests:
1
Perform a redundancy sanity test:
LD 135
STAT CPU
TEST CPU
2
Check the LCD states:
a.
Perform a visual check of the LCDs.
b.
Test LCDs:
LD 135
TEST LCDs
DSPL ALL
3
Test the System Utility cards and the cCNI cards:
LD 135
STAT SUTL
TEST SUTL
STAT CNI c s
TEST CNI c s
4
Test system redundancy:
LD 137
TEST RDUN
DATA RDUN
STAT FMD
STAT RMD
5
Install the two system monitors. Test that the system monitors are
working:
LD 37
ENL TTY x
Load program
Get status of CPU and memory
Test CPU
Load program
Test LCDs
Load program
Get the status of the System Utility card
Test the System Utility card
Get status of cCNI cards (core, slot)
Test cCNI (core, slot)
Load program
Test redundancy
Test database integrity
Status of one or both Fixed Media Devices
(FMD)
Status of one or both Removable Media Devices
(RMD)
Load program
Enable the XMS, where x= system XMS
Large System Installation and Commissioning