Avaya 1000M Installation And Commissioning Manual page 379

Communication server
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

Refer to Table 62 on
Shelf 0 3PE cards to the Core/Net 0 panel; connect Shelf 1 3PE cards to the
Core/Net 1 panel. The 3PE cables for Network Group 0 are factory installed.
Procedure 69
Connecting the Network Shelf 0 3PE cards to Core/Net 0
1
Connect a NTND14 cable of the appropriate length from J3 on the 3PE
card faceplate in Network Group 1, Shelf 0 to the Port 9-1, J3 connection
on the 3PE Fanout panel in Core/Net 0.
2
Connect a NTND14 cable of the appropriate length from J4 on the 3PE
card faceplate in Network Group 1, Shelf 0 to the Port 9-1, J4 connection
on the 3PE Fanout panel in Core/Net 0.
3
Connect a NTND14 cable of the appropriate length from J3 on the 3PE
card faceplate in Network Group 2, Shelf 0 to the Port 10-0, J3 connection
on the 3PE Fanout panel in Core/Net 0.
4
Connect a NTND14 cable of the appropriate length from J4 on the 3PE
card faceplate in Network Group 2, Shelf 0 to the Port 10-0, J4 connection
on the 3PE Fanout panel in Core/Net 0.
5
Install the remaining cables according to the assignments in Table 62 on
page 376.
Procedure 70
Connecting the Network Shelf 1 3PE cards to Core/Net 1
1
Connect a NTND14 cable of the appropriate length from J3 on the 3PE
card faceplate in Network Group 1, Shelf 1 to the Port 9-1, J3 connection
on the 3PE Fanout panel in Core/Net 1.
2
Connect a NTND14 cable of the appropriate length from J4 on the 3PE
card faceplate in Network Group 1, Shelf 1 to the Port 9-1, J4 connection
on the 3PE Fanout panel in Core/Net 1.
3
Connect a NTND14 cable of the appropriate length from J3 on the 3PE
card faceplate in Network Group 2, Shelf 1 to the Port 10-0, J3 connection
on the 3PE Fanout panel in Core/Net 1.
4
Connect a NTND14 cable of the appropriate length from J4 on the 3PE
card faceplate in Network Group 2, Shelf 1 to the Port 10-0, J4 connection
on the 3PE Fanout panel in Core/Net 1.
Cabling network modules and loops
page 376
for cCNI port and slot assignments. Connect
End of Procedure
Large System Installation and Commissioning
Page 379 of 436