1
Prepare equipment for installation; go to "Preparing the equipment for
installation" on
2
Place the fourth module on a column (if required); go to "Placing the
fourth module on a column" on
3
Position and level equipment; go to "Positioning and leveling
equipment" on
Note: If earthquake bracing is required, go to "Installing earthquake
bracing" on
page
column and floor bracing and positioning and levelling equipment.
When those procedures are complete, return to Step 4 or Step 5 (as
applicable) in this summary.
4
Install overhead cable tray kits (if required); go to "Installing overhead
cable tray kits" on
5
Install power supplies in all modules:
a
Make sure the system is disconnected from any power source.
b
Set switches and breakers on all module power supplies or module
power distribution units (MPDU) to OFF.
c
Insert each power supply into the appropriate card cage and hook the
locking devices.
6
Install a NT4N39AA CP PIV Processor Pack and blank faceplate
(N0026096) to cover MMDU slot
7
Install power equipment and ground wiring:
— For AC-powered systems, go to "Installing AC power" on
— For DC-powered systems, go to "Installing DC power" on
8
Plan and designate the main distribution frame (MDF); go to "Planning
and designating a Main Distribution Frame" on
9
Install Power Failure Transfer Units (PFTU) (if required); go to
"Installing Power Failure Transfer Units" on
10 Configure the system monitor; go to "Configuring the system monitor"
on
page
155.
page
66.
page
page
75.
327. The section will provide procedures for installing
page
81.
Large System Installation and Commissioning
Introduction
Page 37 of 436
69.
page
137.
page
149.
page
85.
page
97.

Advertisement

Table of Contents
loading

Table of Contents