Page 38 of 436
Introduction
NN43021-310
Standard 06.01
11 Connect a system terminal (or modem); go to "Connecting a system
terminal or modem" on
12 Install cabling:
— To cable Common Equipment, go to "Cabling Common Equipment
in a Single Group system" on
— To cable network loops, go to "Cabling network modules and loops"
on
page
367.
— To cable IPE Modules to the MDF and to connect lines and trunks,
go to "Cabling lines and trunks" on
13 Power up the system and load the system software; go to "Powering up
the system and initial loading" on
Note: If you upgrade your current system, do not install new software.
Instead, return to the upgrade procedures in Communication
Server 1000M and Meridian 1 Large System Upgrade NTPs
(NN43021-458 to 474).
14 Perform acceptance tests; go to "Performing acceptance tests" on
page
319.
15 To test circuit cards, see "Acceptance tests" in Circuit Card Reference
(NN43001-311). To test telephones and attendant consoles, see
Telephones and Consoles: Description, Installation, and Operation
(NN43001-567).
16 Replace all covers and grills on the front and rear of the system.
March 2013
page
175.
page
191.
page
page
283.
245.