Configuration Tasks; Creating A Monitor Link Group; Configuring The Uplink Port - 3Com 4210 9-Port Configuration Manual

Switch 4210 family
Hide thumbs Also See for 4210 9-Port:
Table of Contents

Advertisement

Before configuring a Monitor Link group, you must create a Monitor Link group and configure member
ports for it. A Monitor Link group consists of an uplink port and one or multiple downlink ports. The uplink
port can be a manually-configured or static LACP link aggregation group, an Ethernet port, or a Smart
Link group. The downlink ports can be manually-configured link aggregation groups or static LACP link
aggregation groups, or Ethernet ports.

Configuration Tasks

Table 2-1 Monitor Link configuration tasks

Creating a Monitor Link Group

Configuring the Uplink Port

Configuring a Downlink Port
Creating a Monitor Link Group
Table 2-2 Create a Monitor Link group
Operation
Enter system view
Create a Monitor Link group
Configuring the Uplink Port
Table 2-3 Configure the uplink port
Enter system view
Enter the specified Monitor Link group view
Configure the
uplink port for
the Monitor
Link group
Task
Operation
Configure the specified link
aggregation group as the
uplink port of the Monitor
Link group
Configure the specified
Smart Link group as the
uplink port of the Monitor
Link group
Required
Required
Required
Command
system-view
monitor-link group group-id
Command
system-view
monitor-link group group-id
link-aggregation group
group-id uplink
smart-link group group-id
uplink
2-3
Remarks
Remarks
Required
Remarks
Required
Use any of the
three approaches

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 4210 9-Port and is the answer not in the manual?

Table of Contents

Save PDF