Powering Up The System - Network Critical SmartNA-X User Manual

10g network access
Hide thumbs Also See for SmartNA-X:
Table of Contents

Advertisement

S
S
NA-X | P
ETTING UP
MART
OWERING UP THE SYSTEM
Follow these steps to set up the chassis with your TAP modules and install it into a server rack.
Unpack all supplied items and lay them on a workbench.
1.
Attach the mounting brackets to either side of the SmartNA-X chassis using the screws provided
2.
Figure 3-1 Attaching mounting brackets to the chassis
Install the appliance into a standard 19" rack (the appliance will occupy 1 rack unit).
3.
Insert SmartNA-X TAP modules in the chassis slots as follows:
4.
Red module
Blue module
CAUTION: Blanking plates MUST be fitted to unused slots to ensure correct cooling.
Figure 3-2 Red TAP modules must be inserted in the left-hand slot only, Blue TAP modules can be inserted in any slot.

Powering up the system

Depending on your chassis configuration, the unit will be fitted with a single PSU (PSU-1) or dual independent
PSUs (PSU-1 and PSU-2,
NOTE: Dual PSUs should be fed from two truly independent supplies to eliminate single points of failure.
(max 10 Gbit/s) – insert in left-hand side slot only (as shown in
(max 1 Gbit/s) – insert in any slot (including left-hand slot if desired)
Figure
3-3).
DRAFT
S
NA™ 10G N
MART
ETWORK
Figure
A
(S
NA-X)
CCESS
MART
(Figure
3-1).
3-2)
15