Chapter 3 - Setting Up Smartna-X; Check Items Included; Installing The Smartna-X Chassis And Tap Modules - Network Critical SmartNA-X User Manual

10g network access
Hide thumbs Also See for SmartNA-X:
Table of Contents

Advertisement

S
ETTING UP
3 –
This chapter provides instructions on setting up the SmartNA-X hardware and connecting to the Management/
Network port and Console/Serial port, which provides local access to command line interface. The chapter covers
the following major topics:
• Check items included, page 14
• Installing the SmartNA-X chassis and TAP modules, page 14
• Powering up the system, page 15
• Connecting to the Management/Network port, page 16
• Logging in to SmartNA-X, page 16

Check items included

The following items are included with the SmartNA-X system:
• SmartNA-X chassis
• SmartNA-X TAP modules
• 10G optical cables
• Serial Management Cable – DE-9 female to 8P8C (1.5 meters)
• Chassis rack mounting kit (brackets and screws)
• 2 x power leads
Check all items are included and report any missing or damaged items immediately to Network Critical for
replacement. See,

Installing the SmartNA-X chassis and TAP modules

CAUTION: Electrostatic discharge can damage electrical components. SmartNA-X components are wrapped in
antistatic bags to prevent this damage. Before handling SmartNA-X components, attach an antistatic wrist strap to
a grounded metal surface to prevent electrostatic discharge from damaging your hardware. If you do not have a
wrist strap, just prior to removing the product from ESD packaging and installing or replacing hardware, touch an
unpainted metal surface for a minimum of 5 seconds.
S
MART
(Red=10
Gbit/s,
Blue=1
Appendix I,"Contact & Support"
DRAFT
C
NA-X
Gbit/s)
for contact information.
3
HAPTER
14

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartNA-X and is the answer not in the manual?

Table of Contents